All analyses
AI analysis

Vidullanka PLC: research report

Fairly valuedbullishSep 28, 2026

Evidence points bullish because June-quarter profit rose 84.5% and its like-for-like net-income margin was the best June result on record. The catch is a fairly valued score of 43 and sharply higher debt.

Reports without a focus are public, one per stock per day. Generation usually takes about 15 minutes, and we'll notify you when it's ready.

Why bullish

  • June-quarter net profit rose 84.5% year-on-year to LKR 556 million, while revenue increased 7.5%, showing a much stronger conversion of income into profit.
  • The latest June net-income margin was the best among seven comparable June quarters, and the company reported winning bids for 18.7 MW of battery storage projects against its existing 51 MW operating portfolio.
  • The reported LKR 600 million estimated equity share in the battery projects is material alongside a LKR 10.6 billion equity base, subject to final awards and approvals.

Against this. The shares are fairly valued on the market-wide measure, scoring 43 of 100, while gearing rose to 52.1% of owners' equity.

Net margin
38.6%
of revenue plus other operating income; profit here is mostly not from revenue
Return on equity
16.9%
twelve months to Jun 30, 2026, unaudited
P/E
13.1sector 24.7
earnings Rs 1.69 per share
P/B
2.22sector 1.86
book Rs 9.93 per share
Dividend yield
2.26%sector 1.43%
29.6% of earnings paid out

Current figures, updated daily from filings to Jun 30, 2026. The report below was written on Sep 28, 2026. Sector figures are the median of 11 listed companies in the same sector.

Overview

Vidullanka develops and operates renewable generation assets, alongside EPC and engineering work, across hydro, solar, dendro and newer battery-storage activities. The central change is that the latest quarter delivered sharply higher profit on only modest revenue growth, while new storage and transmission opportunities broaden the project pipeline but still require approvals or final awards.

Price performance

At LKR 22.10 on 28 September 2026, the voting share had gained 7.3% over one month while the ASPI fell 1.8%, a divergence that records stronger recent trading than the market. It sat below the midpoint of its 52-week range, and 60-day volatility was 45.7% below its own one-year norm even as volume ran 117.1% above the preceding 60-day pace.

Liquidity remains a practical constraint: a LKR 1 million order is more than everything that trades on a typical day, equal to 101.1% of median daily turnover. The three-year record includes two pullbacks of at least 15%, with the deepest decline of 35.3% not yet recovered.

Valuation

The voting share trades on 13.1 rupees for every rupee of trailing profit and 2.22 rupees for each rupee of net assets. Its 16.9% trailing return on equity helps explain why P/B is above the sector median, while the P/E sits at the 38th percentile among reporting power and energy peers and P/B at the 78th percentile.

The valuation is more demanding against Vidullanka's own record: it is more expensive on earnings than at 8 of 12 recorded year-ends and on book value than at 11 of 12. A buyer at this price is relying on a strong latest quarter, which supplied 30.7% of trailing EPS; if that quarter had earned its year-ago margin, P/E would be 15.0 times rather than 13.1 times.

The 2.3% dividend yield is supported by a 29.6% trailing payout, but the recorded payout fell from LKR 1.58 per share in FY2025 to LKR 0.65 in FY2026. FY2027 currently records LKR 0.20, though that year remains incomplete.

News and sentiment

Coverage is unusually heavy, with 25 material articles over 90 days, including 19 positive and no negative items. The volume is 4.1 times Vidullanka's normal monthly coverage, driven chiefly by project disclosures rather than financial results.

The company reported winning bids for 18.7 MW/93 MWh of solar-linked battery storage, with an estimated LKR 600 million equity share, although final awards and approvals remain pending. Separately, its consortium was reported as lowest bidder for a LKR 5.0 billion transmission project, but technical evaluation and a Letter of Award are still outstanding and Vidullanka's revenue share was not disclosed.

Financials

June-quarter revenue rose 7.5% year-on-year, while net profit increased 84.5% to LKR 556 million. The result therefore improved much faster than the revenue line, but LKR 330 million of other operating income was material to total income and means revenue-only profit margins should not be read as operating profitability.

Gross margin was 73.0%, broadly unchanged from 73.1% a year earlier and middling against Vidullanka's comparable June record. Operating margin is not available for the latest quarter. The total-income net margin was 38.5%; a like-for-like year-ago total-income comparison is not supplied, so the reported revenue-based net margin is not used as a margin trend.

The latest quarter is group-basis reporting, consistent with the comparative June quarter. Equity attributable to owners rose to LKR 10.3 billion, while the share count on the latest balance sheet was 1.04 billion; today's shares in issue are slightly higher at 1.04 billion.

Risks

The principal risk is a more leveraged balance sheet funding a larger project portfolio. Debt was LKR 4.9 billion at the latest audited year-end and gearing reached 52.1% of owners' equity, up from 31.6% a year earlier, leaving profitability more exposed to financing and execution demands.

Liquidity has also tightened. The current ratio fell to 1.69 times from 2.10 times, meaning short-term assets, including receivables and project-related current assets, provide a smaller buffer against bills due within a year. Operating cash flow covered only 0.86 times annual net profit and free cash flow was negative LKR 1.4 billion, so not all reported profit was available after investment spending.

Interest cover measured on profit before tax with finance cost added back was 6.56 times. That is still coverage, but below the prior year's 8.87 times as borrowings increased. Final approval risk also remains on the storage awards and the transmission bid, so neither can yet be treated as contracted earnings.

Outlook

As at 28 September 2026, the next scheduled evidence point is the interim quarter ending 30 September 2026, expected to be filed between 6 and 14 November. It will show whether the June profit step-up and the contribution from income outside the revenue line continued.

The other near-term company developments are final approvals for the battery-storage awards and technical clearance plus a Letter of Award for the transmission bid. Approval would convert reported opportunities into projects requiring funding and execution; non-award would leave the present operating portfolio as the earnings base. The data does not disclose Vidullanka's revenue allocation within the transmission consortium, so the eventual earnings contribution cannot yet be sized.

About this report. Generated on Sep 28, 2026 from market data up to Sep 28, 2026, 25 material news articles over 90 days and financials to Jun 30, 2026, and scored 43 of 100 on value (fairly valued) when it was written. Every figure is drawn from EquityLK's own data on this company. AI research can contain errors, so treat it as a starting point, not investment advice.

Previous reports