Overview
WindForce owns, develops and operates renewable power assets, while also providing EPC and operations and maintenance services across wind, solar, hydro and battery storage. The latest quarter delivered higher revenue and profit, but profitability did not keep pace with sales and June margins were weak against the company’s own comparable June record.
The strategic picture improved after the commissioning of grid-scale battery storage and floating solar capacity. Funding discipline is now more important because the proposed green bond was withdrawn and the balance sheet carries materially more debt than at the last audited year-end.
Price performance
At LKR 36.00 on 26 October 2026, WIND had fallen 13.0% over three months, versus a 7.2% fall in the ASPI over the same period. It sat 2.8% up from its 52-week low, so the recent decline has taken it close to the bottom of its own annual range.
Recent volatility and trading activity were below WindForce’s own one-year and 60-day norms. Median daily turnover was about LKR 3.0 million; a LKR 1 million order is about 34% of what trades on a typical day, a large part of a day’s trading. The three-year record includes one fall of 15% or more that has not yet recovered.
Valuation
The P/E is 32.1 times, meaning the market price represents 32.1 rupees for every rupee of trailing profit, and it ranks at the 75th percentile among power and energy peers. The P/B is 1.87 times, or LKR 1.87 paid for each rupee of net assets, at the sector’s 67th percentile.
Trailing return on equity was 5.8%, which is modest relative to the earnings multiple. WindForce is more expensive than 81% of days since April 2021 on P/E. No trailing dividend yield is recorded, although the payout was steady across the latest two financial years. The latest quarter supplied nearly half of trailing EPS, leaving the current multiple reliant on that unusually large contribution.
News and sentiment
Company coverage was about normal, with 20 material articles in the last 90 days: 12 positive, five negative and three neutral. Positive reporting centred on the commissioned 10 MW/40 MWh BESS, a 5 MW floating solar plant, and winning bids for 28.25 MW/143.75 MWh of further storage.
The storage bids still require formal awards, approvals and agreements. Separately, WindForce reported on 29 September that it had withdrawn its proposed LKR 4.0 billion green bond issue because of adverse market conditions, removing a planned funding route rather than adding new capital.
Financials
June-quarter revenue rose 23.4% year-on-year to LKR 2.6 billion, while operating profit rose 10.1% and net profit rose 5.1% to LKR 875 million. Sales therefore grew faster than the profit attributable to the period.
Gross margin fell from 61.8% to 55.7%, operating margin from 47.7% to 42.5%, and net margin from 39.2% to 33.4%. The gross and net margins were the worst of six comparable June quarters, while operating margin was among the worst. This means the higher revenue produced less profit per rupee of sales than a year earlier.
LKR 240 million was absorbed between operating and net profit, compared with LKR 180 million a year earlier, reflecting the effect of finance costs, tax, associates and other below-operating items. Group equity was LKR 32.1 billion at June, but the filing used 1.35 billion shares, versus 1.36 billion ordinary shares currently in issue. Minority shareholders received LKR 112 million of June profit, so group profit is not wholly available to the ordinary shares being valued.
Risks
Financing is the leading risk. Total debt reached LKR 22.3 billion at June, after the March audited accounts showed gearing of 48.9% of owners’ equity and interest cover of 2.72 times. Operating profit covered the interest bill fewer than three times, leaving less room if borrowing costs or project delays rise.
Cash conversion was 0.55 times in the March year, meaning only 55 cents of operating cash flow arrived for each rupee of operating profit, and free cash flow was negative. The withdrawal of the LKR 4.0 billion green bond increases the importance of internally generated cash and alternative funding for projects. Battery-storage bids also remain subject to awards, approvals and agreements.
The power sector backdrop includes grid reliability disruptions and higher energy-market costs. These are sector conditions rather than company-specific outcomes, but they add execution and grid-connection uncertainty for a renewable operator.
Outlook
As at 26 October 2026, the next specific catalyst is the interim filing for the quarter ended 30 September 2026, expected between 6 and 14 November. It will show whether the newly commissioned assets, higher debt and June margin pressure have carried into a later period.
The other material unresolved item is formal award and regulatory approval for the proposed 28.25 MW battery-storage portfolio. Confirmation would establish whether the proposed LKR 944 million equity commitment proceeds; failure to secure it would leave the expansion smaller than the current bid pipeline suggests. The available data cannot establish the eventual project returns or replacement funding terms after the green bond withdrawal.