All analyses
AI analysis

Windforce PLC: research report

OvervaluedbearishNov 4, 2026

Evidence points bearish: June net margin was the weakest of six comparable quarters while the shares remain expensive on earnings. The counterweight is 28.25 MW of battery-storage bids awaiting formal award.

Reports without a focus are public, one per stock per day. Generation usually takes about 15 minutes, and we'll notify you when it's ready.

Why bearish

  • The June net margin of 33.4% was the worst among six comparable June quarters, despite 23.4% revenue growth.
  • The share trades on 31.2 times trailing earnings, more expensive than 79% of days since April 2021.
  • WindForce withdrew its proposed LKR 4.0 billion green bond, removing a planned source of project funding.

Against this. Six project companies hold winning bids for 28.25 MW of battery storage, although formal awards and approvals remain pending.

Operating margin
44.0%sector 31.8%
from 44.2% a year earlier
Net margin
32.9%sector 20.8%
from 36.6% a year earlier, revenue +17.0%
Return on equity
5.9%
twelve months to Sep 30, 2026, unaudited
P/E
32.5sector 29.1
earnings Rs 1.18 per share, year to Sep 2026
P/B
1.92sector 1.90
book Rs 19.92 per share
Dividend yield
0.00%sector 0.00%
trailing twelve months

Current figures, updated daily from filings to Sep 30, 2026. The report below was written on Nov 4, 2026. Sector figures are the median of 11 listed companies in the same sector.

Overview

WindForce owns and develops renewable power assets while also providing EPC and O&M services across wind, solar, hydro and battery storage. The most important recent operational change is its move from conventional renewable generation into grid-scale storage, alongside a floating-solar commissioning and further BESS bids.

That expansion sits against a less favourable financing backdrop: the company withdrew its planned green bond after market conditions shifted. The investment case therefore rests on whether new capacity can add earnings without putting further pressure on funding.

Price performance

At LKR 34.90 on 3 November 2026, WIND had fallen 14.0% over three months, compared with a 4.6% fall in the ASPI. The share is at its 52-week low and 33.8% below its high, a materially weaker record than the broader market over that window.

Trading has become quieter than WindForce's own recent norms, with both volatility and volume lower. Median daily turnover was LKR 3.2 million; a LKR 1 million order is about 32% of what trades on a typical day, a large part of a day's trading. The three-year record contains one fall of 15% or more, a 34% decline that has not yet recovered.

Valuation

The shares trade at 31.2 times trailing earnings, meaning LKR 31.20 is paid for each LKR 1 of the last twelve months' profit, and at 1.81 times book value, or LKR 1.81 for each LKR 1 of net assets. The P/E sits at the 75th percentile of the power and energy peer group, while trailing ROE is 5.8%, so the earnings return on owners' capital is modest relative to the price paid.

WindForce is more expensive than 79% of days since April 2021 on P/E. Nearly half of trailing EPS came from the June quarter; if that quarter had earned its year-ago net margin, the same price would stand on 28.7 times earnings. There is no current dividend yield, and the recorded payout was steady in the two latest financial years.

News and sentiment

Direct coverage was normal overall but unusually quiet in the last 30 days, with 1 article against a monthly baseline of 4.5. Over 90 days, 12 of 20 material articles were positive, while five were negative, largely around financing.

Reported in September, WindForce commissioned a 5 MW floating solar plant and a grid-scale BESS, taking renewable capacity to about 268 MW. Six project companies also submitted winning bids for 28.25 MW of BESS capacity, requiring estimated equity investment of LKR 944 million; formal awards, approvals and agreements remain pending, so the eventual revenue and profit contribution cannot yet be measured. Separately, the proposed LKR 4.0 billion green bond was withdrawn on 29 September.

Financials

June-quarter revenue grew 23.4% year-on-year, but operating profit rose only 10.1% and net profit 5.1%. Gross margin was 55.7% versus 61.8% a year earlier, operating margin 42.5% versus 47.7%, and net margin 33.4% versus 39.2%. The June gross and net margins were each the worst of six comparable June quarters, meaning the larger revenue base produced less profit per rupee of sales than in prior June periods.

Finance costs, tax, associates and other below-operating items absorbed LKR 240 million, up from LKR 180 million a year earlier, further limiting the conversion of operating growth into profit attributable to shareholders. Equity reached LKR 32.1 billion at June, while the balance-sheet share count was 1.35 billion; the small change from the current count does not materially distort the per-share comparison. Minority shareholders received LKR 112 million of June group profit, so group net profit is not entirely the profit available to the ordinary shares being valued.

The latest filed quarter ends 30 June 2026. The September-quarter filing is due now, so these results describe a period the company has already moved beyond.

Risks

Funding is the leading risk. The withdrawal of the LKR 4.0 billion green bond leaves planned storage and solar expansion more dependent on other financing sources at a time of higher market rates. At the latest audited year-end, debt was 48.9% of equity attributable to owners, and operating profit covered the interest bill 2.72 times. This is meaningful leverage for a capital-intensive generator, with limited room for a weaker operating result before interest consumes more of the business profit.

Liquidity within the business was sound at the audited year-end: the current ratio was 2.79 times, meaning current assets, including receivables and other assets expected to turn into cash within a year, were LKR 2.79 for each LKR 1 of bills due within a year. However, operating cash flow converted at only 0.55 times operating profit, so less than LKR 1 of cash arrived for each LKR 1 of operating profit. Minority interests took 28.4% of annual group profit, which limits the portion of group earnings attributable to the shares under review.

Sector conditions also matter. Higher interest rates and fuel costs form a difficult financing and power-market backdrop, although these are sector-wide conditions rather than company-specific developments.

Outlook

As at 4 November 2026, the next specific event is the September interim filing, due in the 2 to 14 November window. It should show whether June's weaker comparable margins persisted and how debt and cash needs changed after the recent project activity.

The other key company event is formal award and approval of the six BESS bids. Award would convert a winning-bid announcement into a defined development pipeline; failure to secure approval would leave the projected investment and capacity addition unrealised. The available data does not disclose the tariffs, project revenues or financing terms needed to quantify the earnings contribution.

About this report. Generated on Nov 4, 2026 from market data up to Nov 3, 2026, 20 material news articles over 90 days and financials to Jun 30, 2026, and scored 14 of 100 on value (overvalued) when it was written. Every figure is drawn from EquityLK's own data on this company. AI research can contain errors, so treat it as a starting point, not investment advice.

Previous reports