Overview
WindForce owns, develops and operates renewable-energy assets while also providing EPC and O&M services across wind, solar, hydro and battery storage. The operating story has shifted toward expansion in solar and grid storage, while the investment case is constrained by an expensive price relative to both reported earnings and the company’s own valuation record.
The June filing is no longer the freshest view of trading: results reported on 11 November cover the first half ending after that filing and therefore supersede it as the current earnings update.
Price performance
At LKR 39.00 on 11 November 2026, the share had risen 12.3% in a week against a 7.3% ASPI gain, but remained down 16.0% over six months while the ASPI fell 4.3%. Over one year it fell 24.0% versus a 3.9% decline in the index, leaving its longer-period return materially behind the market.
The price sits 27.7% up its 52-week range and 22.2% below the high, placing it nearer the low than the high. Sixty-day volatility was 14.4% below its own one-year norm and recent volume was 56.7% below the preceding 60-day pace, so trading activity has cooled rather than accelerated.
The three-year record contains one fall of 15% or more, the deepest 34%, which took 11.9 months to bottom and has not yet recovered. Median daily turnover was LKR 3.4 million; a LKR 1 million order is about 29% of what trades on a typical day, a large part of a day’s trading.
Valuation
The share trades at 34.8 times trailing earnings, meaning LKR 34.80 is paid for every LKR 1 of the last twelve months’ profit, against a sector median of 19.6 times. Its P/B is 2.02 times, or LKR 2.02 for each LKR 1 of net assets, modestly above the sector median of 1.91 times; trailing ROE is only 5.8%, so the premium to book is not explained by a high current return on equity.
The price is more expensive than every day before 2026 and all but 132 days since April 2021 on P/E, and more expensive than 80% of days since April 2021 on P/B. A buyer at this price is relying heavily on the June quarter, which supplied 49.9% of trailing EPS; had that quarter earned its year-ago net margin, the P/E would be 32.0 times rather than 34.8 times.
There is no current dividend yield. The recorded payout was LKR 1.00 per share in both FY2024 and FY2025, below LKR 1.30 in FY2022, while the last LKR 1.00 dividend’s ex-date was 25 February 2025, so a buyer today does not receive it.
News and sentiment
Company coverage was normal over 90 days, with 21 material articles split between 13 positive, five negative and three neutral. The latest 30 days were unusually quiet at two articles versus the company’s monthly baseline of four.
On 11 November, WindForce reported first-half revenue growth of 20% to LKR 5.6 billion and PAT of LKR 1.9 billion, alongside receipt of the first USD 5 million tranche of an USD 18 million IFC facility and financial closure for the 100 MW Rividhanavi Solar Park. These reported results post-date the June filing and are the more current earnings evidence.
Earlier reports described a LKR 4.0 billion green bond withdrawal amid adverse market conditions. They also reported successful bids for 28.25 MW and 143.75 MWh of battery storage, requiring an estimated LKR 944 million equity investment, but formal awards, approvals and agreements remain pending.
Financials
In the June 2026 quarter, revenue grew 23.4% year-on-year, operating profit grew 10.1% and net profit grew 5.1%. Profit therefore expanded much more slowly than sales, meaning the additional revenue translated into less profit per rupee than a year earlier.
Gross margin fell from 61.8% to 55.7%, operating margin from 47.7% to 42.5%, and net margin from 39.2% to 33.4%. The gross and net margins were the worst of six comparable June quarters, while operating margin ranked among the worst, fifth of six. The quarter still generated LKR 874.6 million in net profit, but its LKR 239.6 million gap between operating and net profit shows finance costs, tax and other below-operating items remained material.
Equity rose to LKR 32.1 billion from LKR 27.3 billion a year earlier. Shares outstanding on the June balance sheet were 1.355 billion, versus 1.351 billion a year earlier, so the year-on-year operating comparison is not being distorted by a major share-count change.
The filed June quarter is historical relative to the 11 November first-half update, which reported LKR 1.9 billion PAT. That reported figure should not be mixed into the filed margin series.
Risks
Funding and leverage are the central risk. At the latest audited year-end, debt was 48.9% of equity attributable to owners and operating profit covered interest expense 2.72 times, leaving less room for higher borrowing costs or weaker operating cash generation than a lightly geared utility would have.
The current ratio was 2.79 times, meaning short-term assets, including cash, receivables and other assets expected to turn into cash within a year, were more than bills due over that period. However, operating cash flow equalled only 0.55 times operating profit and free cash flow was negative LKR 216.1 million, so not all reported operating profit was arriving as cash after investment needs.
Minority interests received 28.4% of audited group profit, meaning group net profit is materially larger than the earnings attributable to the ordinary shares being valued. The cancelled LKR 4.0 billion green bond and pending LKR 944 million BESS equity commitment add financing execution risk. Higher policy rates reported in the market backdrop are an adverse funding environment, although the data does not quantify their company-specific effect.
Outlook
As at 11 November 2026, the September interim filing was due within the exchange’s 3 to 14 November historical window, although first-half results were reported that day. The formal filing will determine whether the reported first-half growth is fully reflected in the accounts and will replace the June-based metrics used here.
The next company-specific operating milestones are formal awards, approvals and agreements for the proposed 28.25 MW battery-storage projects, and execution of the 100 MW Rividhanavi Solar Park after financial closure. These would turn announced development activity into committed assets, but the supplied data does not state their future revenue or profit contribution. Sector consultation on a 1.46% fourth-quarter electricity tariff increase remains relevant to the power environment, not a reported change to WindForce’s own earnings.